WIT Press


Energy Efficiency In The Context Of Energy Availability In The Republic Of Tajikistan

Price

Free (open access)

Volume

205

Pages

9

Page Range

115 - 123

Published

2016

Size

602 kb

Paper DOI

10.2495/EQ160111

Copyright

WIT Press

Author(s)

M. Halimjanova, D. Schulz, K.-D. Dettmann, A. Akhrorova

Abstract

According to system indicators characterizing low usage efficiency of fuel and energy resources and the level of energy availability in Tajikistan, the main challenge to the electrical power production in the country is losses of electrical energy at the stages of production, transmission, distribution and use. This problem is a peculiar issue that has gained special awareness in recent years, also considering the withdrawal of effective power transits between central Asian countries like Tajikistan, which is of particular importance during autumn and winter periods.

Keywords

Tajik Aluminium Company (TALCO), energy security, transmission lines, harmonics, thyristor convertor, filter-devices, Central Asia and South Asia project (CASA-1000), thermoelectric plant (CHP), hydro power plant (HPP), DIgSILENT PowerFactory 2016